Projects and visual boards
Use a project to keep related jobs and their planning context within reach. Overview presents linked work orders, notes, photos, and documents; Canvas lets you arrange project elements visually. The two views use the same project content.
The example is Drain and heater follow-up at Maple Plumbing Co. It contains two existing active jobs and two concrete preparation notes. Creating or linking this project did not accept, complete, assign, or invoice either job.
Project Boards
Create the project in the right business
- Select the business and open Projects.
- Choose New Project.
- Enter a useful name, then choose an icon and color if helpful. Create Project stays disabled while the name is blank.
- Choose Create Project and wait for its Overview to open.
- Add real work or useful notes before relying on the board as a planning surface.
Use Search projects… to find the saved project later. The example was found by its exact name and reopened after creating and restoring it.
Link existing work orders
- Choose Link work order.
- Review the job name, number, status, and any date or amount shown in the picker.
- Select the intended job. Repeat for another job where appropriate.
- Confirm the linked rows in Summary or Work orders.
- Open a row to inspect the actual order before making an operational change.

The example's Drain Cleaning and Water Heater Install links survived a full page reload. From Drain Cleaning, Details → Projects displayed this project; choosing its project badge returned to the same Overview.
The work-order page also offers Link project for connecting an existing project. Linking organizes the job; it does not change the job's assignee or status. Use Work orders and assignment for those actions.
The row's Details action inspects its linked project element. Use the unlink action only when removing the relationship is intended. It is different from deleting or cancelling the source job. Keep the source order as the authority for current fulfillment information; a saved canvas preview can retain the information present when it was linked.
Write the next action as a note
Choose Add note, write the operational context, and choose Save note. The example records two different concerns:
- Before the follow-up: review camera findings, arrange rear access, and keep the laundry area usable by noon.
- Equipment and closeout: bring camera supplies and floor protection, then confirm the heater model and isolation valve with dispatch before arranging the return visit.
Use Edit to revise a note. Open note on canvas locates that note in the visual view. Project notes and work-order notes are separate: editing this planning note does not rewrite the instructions stored on the source order or send a customer message.
Arrange the visual canvas
Switch to Canvas to arrange the linked elements and notes. In the example, each note sits below the job it helps prepare.

- Choose Select and drag an element to its intended position.
- After a drag, the tool returns to Grab. Select again before moving another element.
- Use Grab to pan around the canvas, and the zoom controls to inspect the work. Reset View returns to the default view; it does not delete the elements.
- Open a note's edit control, change its text, and leave the editor to apply the change.
- Watch Saving… become Saved, then reopen the project and check the result.
The walkthrough moved the two job headers apart, placed the notes beneath them, and edited the equipment note on Canvas. Overview showed the updated text, and reopening Canvas retained the element positions. View zoom returned to its default on reopening; saved content and current viewing position are separate concerns.
The canvas also offers Draw, Comment, and Add controls. The walkthrough verified linked work orders, note editing, movement, zoom, and saving. It did not exercise drawing, comment threads, image uploads, or every linked element type. A comment can include author identity, so review its audience and content before adding customer-sensitive information.
Photos, files, and documents
Photos provides project photo browsing, upload controls, captions, and file-context search. It can include media linked directly to the project or its linked work orders. Docs displays linked notes, draft photo reports, and session transcripts from the media workflow; Open Files takes you to the file workspace.
In this example, Photos had no related images and Docs had no related reports or transcripts. No empty-panel screenshot is presented as a populated media workflow. The walkthrough did not upload media or demonstrate document generation/download. See Files and Camera for those workflows.
The Docs tab inside a project is not the same list as the standalone Documents workspace. A normal document is not automatically attached to a project merely because its title mentions that project.
Archive and restore a finished project
On the Projects list, use the project's Archive project control when you want it out of the active list. Open Archived, find it, and choose Restore project to return it. The new example project was archived and restored successfully with all four elements intact.
Archived projects also offer Permanently delete, with a confirmation explaining the loss of the board and its items. The walkthrough did not delete any project. Inspect the project and its source records before deciding what should be retained.
Troubleshooting
- The project is missing: confirm the business, search by its name, and inspect Archived.
- The board looks empty or overlapping: check zoom and panning. Elements added through Overview can start at similar canvas positions; separate them using Select.
- Dragging moves the whole view: choose Select again. The canvas returns to Grab after an element drag.
- A note differs between views: finish the note edit, wait for Saved, and reopen. Check any save error before continuing.
- A linked preview looks out of date: open the actual work order and inspect its current record.
- Photos or reports are missing: check their project/work-order associations and media filters; a link to a job does not create attachments.
Follow Prepare a job follow-up for the connected example.
Continue with Work orders, Calendar, Files, and Documents.